Public Works Projects
The Public Works Department oversees a wide range of projects every year which are approved by Council to meet the goals of the Town's strategic plan. This process of scheduled maintenance and planned reconstruction keeps infrastructure functioning and in a sustainable condition. A list of current initiatives is noted below:
- Carnegie Building Repurposing
- Boyd Bay Wharf Dock Re-Decking
- Bracebridge 150 Forest (Bracebridge 150 Legacy Project)
- Bracebridge Resource Management Centre Signage, Trailhead and Parking Lot
- Collin Cameron Trail Surfacing
- James W. Kerr Park Baseball Diamond and Field Resurfacing; and Barrier Free Pathway
- Memorial Park Bandshell Reconstruction (Bracebridge 150 Legacy Project)
- Memorial Park Washrooms Preliminary Design
- Municipal Trail System Level of Service (Deferred 2026)
- Parkland and Greenspace Signage Design Standards and Guidelines Manual
- Peake Fields at Verena Acres Diamond Resurfacing
- Prospect Lake Beach Park Fencing
- Springdale Park Road Dock Replacement
- Taylor Road Roundabout Garden Redevelopment
- Trans Canada Trail (Liza Crescent Section)
Road |
From |
To |
Distance |
Dates |
Scope of Work |
---|---|---|---|---|---|
Bird Lane* |
Taylor Road (Muskoka Road 42) |
End |
0.35 km |
2025 |
Pulverization, Asphalt |
Cedar Lane |
0.2 km south of Pine Street |
Park Road |
0.94 km |
2025 |
Pulverization, Asphalt |
Clearbrook Trail Pedestrian Crossing |
Windsong Crescent |
Rosemead Close |
NA |
Starting July 2025 |
Mid-block Pedestrian Crossing |
Dell's Lane |
Settler's Lane |
End |
0.24 km |
Starting Week of July 28, 2025 |
Pulverization, Double Surface Treatment |
Graves Road |
Manitoba Street (Muskoka Road 4) |
End |
0.15 km |
Starting Week of July 28, 2025 |
Pulverization, Double Surface Treatment |
Hiram Street* |
Ann Street |
McDonald Street |
0.28 km |
2025 |
Pulverization, Asphalt |
Lone Pine Drive Four (4) Large Culvert Replacements |
- |
- |
- |
2025 |
Replacement |
Matthiasville Road Culvert Replacement |
- |
- |
- |
July 15 to September 15, 2025 |
Replacement |
Miriam Drive |
Peterson Bridge |
Loggers Road |
2.5 km |
Early August 2025 |
Double surface treatment |
Partridge Lane |
South Monck Drive |
0.25 km westerly |
0.25 km |
Starting Week of July 21, 2025 |
Pulverization, Double Surface Treatment |
Richard Street* |
Woodchester Avenue (0.1 km east) |
Bird Lane |
0.26 km |
2025 |
Pulverization, Asphalt |
Wilson's Falls Road |
Ann Street |
End |
2.10 km |
Starting July 15, 2025 |
Pulverization, base stabilization, double surface treatment |
*To be completed in coordination with the District Municipality of Muskoka.
The Town is committed to maintaining a safe and organized work site throughout infrastructure upgrades.
The work may result in minor traffic delays, heavy equipment and elevated noise levels, and intermittent dust. In certain cases, temporary road closures or restricted access to regular parking areas may be necessary. Advance notice will be provided for any full road closures, and local traffic will continue to have access to their properties.
Please note that construction schedules and associated service interruptions may change due to weather, traffic, road conditions, or other unforeseen circumstances.
Every effort will be made to minimize disruptions, and we appreciate the public’s patience and understanding.
- Bird Lane*
- Depot Drive
- Entrance Drive
- Front Street
- Hiram Street
- Pine Street
- Richard Street*
- Wharf Road Curb and Gutter Extension and Splillway
- Woodward Street
*To be completed in coordination with the District Municipality of Muskoka.
- Bird Lane Storm Sewer Construction*
- Cedar Lane Concrete Structure Rehabilitation
- Hillcrest Avenue and Spruce Lane Storm Sewer Design
- Hiram Street and Chub Downey Lane Storm Sewer Outfall Rehabilitation
- Mahaffy Court Storm Sewer Outfall Rehabilitation
- Sherwood Drive Storm Sewer Design
- Richard Street Storm Sewer Construction*
*To be completed in coordination with the District Municipality of Muskoka.
- Streetlight Condition Assessment
- Automated Speed Enforcement Analysis and Feasibility Study
- Salt Management Plan Update
- District Road Maintenance Agreement Review (Deferred 2026)
- Long-Term Parkland, Green Space and Waterfront Access Development Plan (Deferred 2026)
- Municipal Office Electric Vehicle Feasibility and Infrastructure
- Municipal Storm Water System Review
- Transit Master Plan Outcomes: Software Upgrades