The Town of Bracebridge is replacing the Purbrook Road Bridge to ensure safe and reliable access for residents and visitors. The existing bridge, located over McKay Creek, is more than 100 years old and has reached the end of its service life. Following its most recent inspection, full replacement was recommended due to advanced deterioration. Replacing the bridge ensures continued access for the approximately 140 properties located beyond the structure.

This project will deliver a modern, durable structure designed to meet current engineering standards while minimizing environmental impacts and construction disruption.

The new bridge will:

  • Be constructed using precast, prestressed concrete components;
  • Meet modern highway loading standards;
  • Include a cast-in-place concrete deck for durability; and
  • Be designed to withstand weather, moisture, and freeze-thaw cycles.

To minimize environmental impacts and reduce construction complexity, an innovative bridgereplacement approach will be used that allows the existing bridge to remain in place while a new structure is built over and behind. This method helps protect the surrounding natural environment and shortens the time needed for onsite construction.

Proposed Project Timeline

April 2026 Tender Period

June 2026 Council Approval

Late June 2026 Construction to begin

End of October 2026 Project Completion

Frequently Asked Questions

The bridge has reached the end of its lifecycle and is experiencing advanced deterioration. Replacement is the safest and most cost-effective long-term solution.

Construction is expected to begin in late June 2026, pending final approvals and contractor scheduling.

Yes, for most of the project. Temporary access will be maintained except during short-term full closures, which will be communicated in advance.

Closure durations will be determined as the project progressed. Updates will be shared as soon as details are available.

There will be periods where access is impacted. The Town is working closely with emergency services to manage these situations and maintain response plans.

Yes. Some work may occur at night to reduce daytime disruptions.